top of page
PXL_20210810_141042234.jpg

My Past Projects

Free estimates on your projects and repairs.

Projects: Projects
PXL_20210810_140902773.jpg
PXL_20210810_141042234.jpg
PXL_20211103_145632225.MP.jpg
PXL_20211109_220625157.jpg

Hughes

Before

Years rusted away base channel and pushing mulch in the building forced walls out.

Hughes

Before

Years rusted away base channel and pushing mulch in the building forced walls out.

Hughes

During Repairs

Tore out rusted and damaged materials and started installing new base trims, wall panels, etc.

Hughes

After

Finished suppling and installing new base trims, corner trims, gable, gutter, base channel, and wall panels.

PXL_20211109_220718390.jpg
PXL_20210116_154218032.jpg
PXL_20211105_161538979.jpg
PXL_20211202_175423384.jpg

Hughes

After

Finished suppling and installing new base trims, corner trims, gable, gutter, base channel, and wall panels.

SOS Heating & Air

Before

Car rolled down into the building damaging wall panels and wall girt.

SOS Heating & Air

During

Removed damaged wall girt and damaged part of wall panels.

SOS Heating & Air

After

Finished installing new wall girt and new wall sheeting.

PXL_20211113_144817727.jpg
PXL_20211119_154318169.jpg
PXL_20211120_131727118.jpg
PXL_20211124_163104629.jpg

Builders Supply

Before

Years of weather and wind made roof panels and fasteners fail.

Builders Supply

During

Removing old damaged metal panels and nails.

Builders Supply

During

Installing new metal roof panels and screws.

Builders Supply

After

Old roof removed and new roof panels and roof to wall flashing installed.

PXL_20211016_162837823.jpg
IMG_20211118_150432.jpg
PXL_20211202_174950260.jpg
PXL_20211217_180624115.jpg

Three B's

Before

Vehicle ran into the corner of the entry causing damage to entry, entry got pushed off its stem wall.

Three B's

During

Removed entry and concrete, installed new Bollards to protect new entry.

Three B's

During

Installed new entry way structure.

Three B's

After

New structure up and wall panels and trims installed.

PXL_20211214_153953817.jpg
PXL_20211214_175043754.jpg
PXL_20211216_160537856.jpg
PXL_20211220_155022123.jpg

Werner Museum Awnings

Before

Adding awnings over 2 walkdoors

Werner Museum Awnings

During

Installing awning structure.

Werner Museum Awnings

During

Installing awning panels

Werner Museum Awnings

After

2 Awnings finished above walkdoors

bottom of page